Model NO.: Led tube light
Lamp Holder/Base: G13
LED Type: SMD 2835
Shell Type: Milky White
Lifespan: 30000H
Warranty: 2 Years
Certification: CE, RoHS, SAA, EMC, LVD
Input Voltage: 85-265V
LED Chips: Epistar
Model: LED Tube Light
Tube Light Type: T8 LED Tube Light
CRI(Ra): 80
Power Factor: 0.55
Energy Saving: 80
Trademark: ORION
Transport Package: 1CTN=40PCS
Specification: 1240*290*210mm
Origin: Hangzhou, China
HS Code: 9405409000
Model NO.: Led tube light
Lamp Holder/Base: G13
LED Type: SMD 2835
Shell Type: Milky White
Lifespan: 30000H
Warranty: 2 Years
Certification: CE, RoHS, SAA, EMC, LVD
Input Voltage: 85-265V
LED Chips: Epistar
Model: LED Tube Light
Tube Light Type: T8 LED Tube Light
CRI(Ra): 80
Power Factor: 0.55
Energy Saving: 80
Trademark: ORION
Transport Package: 1CTN=40PCS
Specification: 1240*290*210mm
Origin: Hangzhou, China
HS Code: 9405409000
Led fluorescent tube T8 LED tube 18W 1.2M led tube light
Product Features: *Â Wattage: LED TUBE 10w 15w 20w *Â Chip: Epistar *Â Voltage: AC 85-265VÂ 50/60Hz *Â Lumen:100lm/w *Â Installtion:Â installationed in fixtures |
 * Material: Glass |
Packaging Details: CARTON Carton Dimensions: 64.5*20.5*20.5 cm Quantity/Carton: 25pcs Quantity of 20GP/40GP/40HQ: 24500/49800/59500pcs   | |
Certificates: |
Logistics Ability: Arrange the Mixed logistical for Election delivery as By Air and By Sea, over 10 years' experience for logistical arrange. |
Delivery Time: Material Preparation Time: 10 days Assembly & Packaging Time: 15 days Total Delivery Time: 25 days in 50,000pcs for safe delivery lead time. The faster delivery could be negotiable. |
Factory Scale: Total Area of: 5000 square meters (538193 square feet) Production Staff: 100 to 200 QC Staff: 10 to 20 R&D Staff: 6 to 10 |
Application: Meeting room, Exhibition, Hospital; Hotel; Office; Library; Super market; indoor lighting |

FAQ
Q1.Are you manufacturer or Trade Company?
We are a professional manufacturer of led bulb,led tube light,led panel and energy saving bulb.
Q2. What terms of payment you use?
TT,LC and Western union.
Q3.How do you offer samples?
We offer free samples in certain quantity and delivery within 5-7 working days.
Q4. What's the order process?
a. Inquiry---provide us all clear requirements.
b. Quotation---official quotation form with all clear specifications.
c. Printing file--- PDF, Ai, CDR, PSD, the picture resolution must be at least 300 dpi.
d. Sample confirmation---digital sample, blank sample without printing or hardcopy.
e. Payment terms--- TT 30% in advanced, balanced before shipment.
f. Production---mass production
g. Shipping--- by sea, air or courier. Detailed picture of package will be provided.
Q5.What is your delivery time?
Sample order: 5-7 working days
Mass order:Â Â 20-25 working days after 30% deposit received.
Q6.What is your MOQ?
For this model, usually our MOQ is 3000pcs, but we also accept sample order for trial.
Q7.Can your factory make the lights based on customers' design?
Yes, we offer OEM and ODM service, we have professional engineers for R&D.

 Led fluorescent tube T8 LED tube 18W 1.2M led tube light

Product Features: *Â Wattage: LED TUBE 10w 15w 20w *Â Chip: Epistar *Â Voltage: AC 85-265VÂ 50/60Hz *Â Lumen:100lm/w *Â Installtion:Â installationed in fixtures |
 * Material: Glass |
Packaging Details: CARTON Carton Dimensions: 64.5*20.5*20.5 cm Quantity/Carton: 25pcs Quantity of 20GP/40GP/40HQ: 24500/49800/59500pcs   | |
Certificates: |
Logistics Ability: Arrange the Mixed logistical for Election delivery as By Air and By Sea, over 10 years' experience for logistical arrange. |
Delivery Time: Material Preparation Time: 10 days Assembly & Packaging Time: 15 days Total Delivery Time: 25 days in 50,000pcs for safe delivery lead time. The faster delivery could be negotiable. |
Factory Scale: Total Area of: 5000 square meters (538193 square feet) Production Staff: 100 to 200 QC Staff: 10 to 20 R&D Staff: 6 to 10 |
Application: Meeting room, Exhibition, Hospital; Hotel; Office; Library; Super market; indoor lighting |

FAQ
Q1.Are you manufacturer or Trade Company?
We are a professional manufacturer of led bulb,led tube light,led panel and energy saving bulb.
Q2. What terms of payment you use?
TT,LC and Western union.
Q3.How do you offer samples?
We offer free samples in certain quantity and delivery within 5-7 working days.
Q4. What's the order process?
a. Inquiry---provide us all clear requirements.
b. Quotation---official quotation form with all clear specifications.
c. Printing file--- PDF, Ai, CDR, PSD, the picture resolution must be at least 300 dpi.
d. Sample confirmation---digital sample, blank sample without printing or hardcopy.
e. Payment terms--- TT 30% in advanced, balanced before shipment.
f. Production---mass production
g. Shipping--- by sea, air or courier. Detailed picture of package will be provided.
Q5.What is your delivery time?
Sample order: 5-7 working days
Mass order:Â Â 20-25 working days after 30% deposit received.
Q6.What is your MOQ?
For this model, usually our MOQ is 3000pcs, but we also accept sample order for trial.
Q7.Can your factory make the lights based on customers' design?
Yes, we offer OEM and ODM service, we have professional engineers for R&D.

Â
Shenzhen Ousida Technology Co., Ltd , https://www.osdvape.com